Building Costs and Contracts
Building Costs and Contracts: How to Compare Quotes and Avoid Disputes
Why the cheapest quote isn't always the best value, what provisional sums really mean, and how getting the scope, contract and payment terms right before work begins protects your budget.
Last reviewed
Key points
- The cheapest quote is not always the best value. A low price often means something has been left out or the scope is unclear, and the gap shows up later as an unexpected bill.
- Quotes are only comparable if they cover the same work. Put the same drawings and specification in front of every builder.
- Provisional sums are placeholders, not prices. The more of them a quote contains, the less fixed the price really is.
- The groundwork before work begins, meaning scope, contract and payment terms, matters more than almost anything you can do once the build is under way.
- Understand what a change will cost before you agree to it, not after the invoice arrives.
Why the lowest price can cost the most
A building quote is a description of work with a price attached. When two quotes differ by a large amount, the difference is rarely that one builder is simply more efficient. More often one of them has priced less work, priced the same work vaguely, or pushed the uncertain parts into allowances that will be settled later. Episode 9 of The Healthy House Podcast, with quantity surveyor Fiona Hall of Construction Q, makes this point directly: when costs are unclear or work has been left out, the cheapest quote can turn out to be the most expensive one.
That doesn’t mean paying more is safer either. It means the number on the front page is the least useful thing to compare.
How to compare quotes like for like
Start from a single set of documents: the same drawings, the same specification and the same list of what you expect to be included. Ask each builder to price against those, and to say clearly what they have excluded. Then lay the quotes side by side and look for:
- work one quote includes that another doesn’t mention at all
- items described in general terms (“allow for electrics”) rather than specifically
- provisional sums, and how large they are relative to the total
- who is responsible for things that often fall between trades, such as making good, waste removal and scaffolding
If the project is large or complicated, this is exactly the job a quantity surveyor does.
Provisional sums: what they really mean
A provisional sum is an allowance for work whose cost isn’t known yet, usually because a decision hasn’t been made or the work can’t be measured until something is opened up. It is a legitimate and sometimes unavoidable part of a quote. The risk is treating it as a firm price. The final figure can go up or down, so ask what decision or discovery will settle each one, and who carries the risk if it comes in higher.
Scope, contract and payment terms
The most consistent message from the episode is that the groundwork before work begins protects you better than anything you do once the build is under way. In practice that means three things written down before anyone picks up a tool:
- Scope: what is being built, to what standard, and what is not included.
- Contract: who is responsible for what, and what happens if the work changes or runs late.
- Payment terms: how much is paid, when, and against what.
Most disputes trace back to something that was assumed rather than agreed. Settling these in advance is the cheapest protection available.
Changes during a build
Changes are normal. The problem is agreeing to them casually. A small alteration can affect other trades, the programme and the budget, and the cost is much harder to challenge once the work is done. Ask for the price, and the effect on timing, before you say yes. A clear original scope and contract make this far simpler, because everyone can see what the change is a change from.
Where damp, ventilation and building health fit in
Cost advice and building health meet more often than people expect. Work that looks cheap at quote stage, such as insulation, airtight upgrades or new windows, can create moisture problems if ventilation isn’t considered alongside it. Our guide to condensation and ventilation explains why, and the host of this podcast, Weather Wise Solutions, is a damp, mould and condensation specialist whose surveyors see the results of poorly scoped work first-hand. If you are pricing a project on an older or problem property, getting the damp diagnosis right before you agree the scope is one of the most valuable things you can do.
Listen to the episode
Episode 9, “Before You Build: The Advice That Could Save You Thousands”, is about an hour and twenty minutes. It is for anyone comparing quotes before a renovation or extension, for small contractors who want to understand the cost and contract side of a project, and for anyone curious about a career in construction.
Common questions
How do I compare builders' quotes properly?
Compare what each quote includes, not just the bottom-line figure. Two quotes are only comparable if they describe the same scope of work, so ask each builder to price against the same drawings and specification and look for anything one has left out. A quantity surveyor can do this comparison for you if the project is large enough to justify it.
What is a provisional sum in a building quote?
A provisional sum is a placeholder allowance for work whose cost isn't yet known, so it is not a firm price and the final figure can go up or down. A quote with many provisional sums is closer to a starting estimate than a fixed price, so count them and ask what has to be decided before each one becomes a real number.
Is the cheapest builder's quote always the best one?
No. A low price can simply mean the scope is unclear or something has been left out, and that gap tends to reappear later as an unexpected bill. Treat a quote that is far below the others as a reason to ask questions, not as a bargain.
What does a quantity surveyor do for a homeowner?
A quantity surveyor helps manage the cost of a building project, from understanding what the work should cost to keeping contracts, payments and changes in order. The best time to involve one is before work begins, while the scope and contract can still be shaped.
How do I avoid disputes with my builder?
Agree the scope, the contract and the payment terms in writing before work starts. Most disputes come from things that were never pinned down, such as what was included, when payment was due or who agreed a change, so settling them in advance is the best protection.
What should I do before agreeing a change during a build?
Ask what the change will cost, and what it does to the programme, before you agree to it. Changes made once work is under way can move the budget by more than people expect, and they are far easier to price properly when the original scope and contract were clear.
Hear it discussed
Episodes on this subject
Before You Build: The Advice That Could Save You Thousands
How do you know if you’re paying the right price for your building project? In Episode 9 of The Healthy House Podcast, Aaron is joined by Fiona Hall from Construction Q to explore how quantity surveying can help homeowners and contractors manage costs, avoid disputes and…
With Fiona Hall, Construction Q
Before You Build: How to Get Your Home Project Right
Planning a home renovation or extension? The decisions you make before building starts can have the biggest impact on your budget, your timeline and how well your home works for you.
With Alexandra Powell, Powell Design & Construction
Why Quality Joinery Is Worth Every Penny
Keith Dowley of Ultimate Joinery Solutions joins Aaron Worrall to explain why cheaper joinery quotes rarely cover the same work, why timber needs ventilation rather than sealing, and how to choose a joiner you can trust.
With Keith Dowley, Ultimate Joinery Solutions